Inga 3 Development Program

Project Description

The Inga 3 project is a strategic initiative by the DRC to build a hydroelectric dam with an estimated capacity of 4,800 MW on the Congo River in Central Kongo Province. It is the third phase of the Inga hydroelectric complex, which already includes the Inga I and Inga II power plants, and is part of the Grand Inga program, which aims to exploit the river’s energy potential of more than 40,000 MW.

This project aims to provide sustainable electricity to support national industrial growth and exports to neighboring countries in outhern African region.

Public policies:

  • The Government Action Program (2024–2028)
  • The National Strategic Development Plan (PNSD 2024–28)
  • The DRC Industrialization Master Plan for 2040.

Project Location:

Central Kongo Province

Lead Agency/ Project Promoter:

Agency for the Development and Promotion of the Grand Inga Project (ADPI)

Contact

26 ITPR Building, 1st floor, Boulevard Colonel Tshatshi, Kinshasa/Gombe
Tel: +243 812 345 678 / 811 971 504
Email: info@adpi-rdc.com
Website: https://adpi-rdc.com/

Actions Required/ Implementation Arrangements/ Contract Type:

  • Joint venture,
  • Public Private Partnership
  • Loan

Availability of Pre-feasibility Studies, Feasibility Studies, and other Studies:

  • PDI3 brochures
  • Site visualization maps
  • Technical reports

Estimated Cost of the Project:

US 1,000,000,000

Investment Required

US 1,000,000,000

Period of Implementation:

  • Phase 1 (2025-2030): Project preparation;
  • Phase 2 (2027-2035): Inga3 development phase and national and regional investments
  • Phase 3 (2028-2034): Local development within the Iinga3 footprint
  • Phase 4 (2028-2035): Development of the Inga Growth Corridor

Remarks:

A prerequisite for national economic growth, promoting development of the industrial sector, especially mining, whose competitiveness and productivity are heavily dependent on electricity.

Please register or login to download this investment project PDF.
REGISTER

Login

Country

DR Congo

Location (s)

Kongo Central

Sector

Infrastructure: Transport, Energy, ICT, Mining and Water

Sub Sector

Renewable Energy

Investment Value Range

+ 100 million USD

View country profile(s) for investment incentives, success stories and other publications.

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

DR Congo Investment News

Kinshasa enters shipping business, set to rock EA boats

May 22, 2022

A vessel docks at the port of Dar es Salaam. The DR Congo says it has obtained yard spaces in Mombasa and Dar es Salaam to roll out offices for its new shipping line, The Lignes Maritimes Congolaises, that will start operations from June. PHOTO | AFP The Democratic Republic of Congo is entering shipping…

READ NEWS

DRC State-owned shipping line to set base in Mombasa

May 16, 2022

A shipping line from the Democratic Republic of Congo plans to start its operations from Mombasa beginning June this year. The state-owned shipping line, the Lignes Maritimes Congolaises (LMC) seeks to channel more DRC imports and exports cargo through the Port of Mombasa. A delegation from DRC led by the shipping line director LMC Dr…

READ NEWS

52 ZAMBIAN BUSINESSES IN DRC FOR TRADE:

October 20, 2021

The first cohort of over 52 representatives of Zambian companies has arrived in the Democratic Republic of Congo (DRC) ready to talk business with their Congolese business counterparts. The delegation is led by Zambia Development Agency (ZDA ) Acting Director General Albert Halwampa, ZDA Director Enterprise Development Gabriel Musentekwa, ZDA Acting Director Export Development Obby Banda,…

READ NEWS

DRC: Clean-Seas to Generate Electricity From Plastic Waste via Pyrolysis

August 5, 2021

Clean-Seas, a provider of waste management technology solutions, have been selected to build a waste-to-energy plastics plant using pyrolysis technology in Kinshasa, the capital of the Democratic Republic of Congo (DRC). The project aims to produce 96 MWh of electricity per year. The plastic waste-to-energy project in Kinshasa can begin. On August 3rd, 2021, Hamden,…

READ NEWS

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

More Renewable Energy Investment Projects in DR Congo

Construction of the “Porte d’Enfer” Hydroelectric Power Plant

The Porte d’Enfer hydroelectric site is located on the Congo River in Tanganyika Province in southeastern DRC with potential of 132MW. The existing Bendera hydroelectric power plant only provides 18MW, which does not meet the needs of surrounding urban areas. The Porte d’Enfer power plant is urgently needed to strengthen the southern electricity production hub…

View Project Info

Construction of Hydroelectric Power Plants on the Inkisi River

The Inkisi hydroelectric sites in the DRC are at Bemba, Sanga2, Kimbungu, and Kilenfu on the Inkisi River in Kongo Central Province, in the west of the country. They have a combined potential of 185MW and are situated less than 150km from Kinshasa, which has a power deficit of about 1,000MW. The project aligns with…

View Project Info

Construction of Luapula Hydroelectric Power Plants

The Luapula hydroelectric site (Mambilima and Mumbotuta Falls) consists of waterfalls on the Luapula River on the border between Zambia and the DRC in the eastern part of Haut-Katanga Province. The potential is 800MW across three waterfalls. The site is in the most important mining area in the DRC, where the electricity deficit is around…

View Project Info