Construction of the “Porte d’Enfer” Hydroelectric Power Plant
Project Description
The Porte d’Enfer hydroelectric site is located on the Congo River in Tanganyika Province in southeastern DRC with potential of 132MW.
The existing Bendera hydroelectric power plant only provides 18MW, which does not meet the needs of surrounding urban areas.
The Porte d’Enfer power plant is urgently needed to strengthen the southern electricity production hub in the DRC, with the possibility of integration with the southern grid that supplies the mining industry.
Project activities:
- Preparation of studies
- Mobilization of private financing
- Project management
- Commissioning and operation of the power plant.
Public policies:
- The Government Action Program (2024–2028) on electricity production capacity;
- The National Strategic Development Plan (PNSD 2024–28) to guarantee reliable access to electricity for all
- The Master Plan for Industrialization of the DRC by 2040 to drive GDP growth.
Project Location:
Tanganyika Province on the Congo River downstream from the city of Kongolo
Lead Agency/ Project Promoter:
National Electricity Company
Contact
2831 Avenue de la Justice, Kinshasa/Gombe, Democratic Republic of Congo, PO Box 500
Tel: +243 816 706 254
Email: snel_dg@snel.cd
Actions Required/ Implementation Arrangements/ Contract Type:
Concession Type of Public Private Partnership
Availability of Pre-feasibility Studies, Feasibility Studies, and other Studies:
- Pre-feasibility studies carried out by AECOM in 2019 with SNEL SA
- Funding being sought.
Supporting documents available for partners:
- SNEL SA’s Master Plan for the Development of Electrical Infrastructure
- SNEL SA Priority Investment Program;
- SNEL SA Business Plan
- SNEL SA Recovery Plan.
Estimated Cost of the Project:
US 764,200,000
Investment Required
Own contribution: US 111,300,000
External contribution: US 652,900,000
Project Financial Position:
US 152,000,000 a year in revenue, excluding various technical and non-technical losses. 792GWh/year of electricity that can be produced at an average rate of US 0.192/kWh
Period of Implementation:
- Studies: eight months
- Procurement and contracting: six months
- Construction work: six years
- Operation: 30 years
Remarks:
A prerequisite for national economic growth, particularly promoting the industrial and mining sectors, which are heavily dependent on the availability of reliable electricity.
Please register or login to download this investment project PDF.
REGISTER
Login
Country
DR Congo
Location (s)
Tanganyika
Sector
Infrastructure: Transport, Energy, ICT, Mining and Water
Sub Sector
Renewable Energy
Investment Value Range
+ 100 million USD
View country profile(s) for investment incentives, success stories and other publications.
Get in Touch
Interested in this project? Please get in touch by filling out the contact form below.
ComesaRIA Investment Map Get In Touch
Investment project information request
"*" indicates required fields
DR Congo Investment News
Kinshasa enters shipping business, set to rock EA boats
A vessel docks at the port of Dar es Salaam. The DR Congo says it has obtained yard spaces in Mombasa and Dar es Salaam to roll out offices for its new shipping line, The Lignes Maritimes Congolaises, that will start operations from June. PHOTO | AFP The Democratic Republic of Congo is entering shipping…
READ NEWSDRC State-owned shipping line to set base in Mombasa
A shipping line from the Democratic Republic of Congo plans to start its operations from Mombasa beginning June this year. The state-owned shipping line, the Lignes Maritimes Congolaises (LMC) seeks to channel more DRC imports and exports cargo through the Port of Mombasa. A delegation from DRC led by the shipping line director LMC Dr…
READ NEWS52 ZAMBIAN BUSINESSES IN DRC FOR TRADE:
The first cohort of over 52 representatives of Zambian companies has arrived in the Democratic Republic of Congo (DRC) ready to talk business with their Congolese business counterparts. The delegation is led by Zambia Development Agency (ZDA ) Acting Director General Albert Halwampa, ZDA Director Enterprise Development Gabriel Musentekwa, ZDA Acting Director Export Development Obby Banda,…
READ NEWSDRC: Clean-Seas to Generate Electricity From Plastic Waste via Pyrolysis
Clean-Seas, a provider of waste management technology solutions, have been selected to build a waste-to-energy plastics plant using pyrolysis technology in Kinshasa, the capital of the Democratic Republic of Congo (DRC). The project aims to produce 96 MWh of electricity per year. The plastic waste-to-energy project in Kinshasa can begin. On August 3rd, 2021, Hamden,…
READ NEWSGet in Touch
Interested in this project? Please get in touch by filling out the contact form below.
ComesaRIA Investment Map Get In Touch
Investment project information request
"*" indicates required fields
More Renewable Energy Investment Projects in DR Congo
Construction of Hydroelectric Power Plants on the Inkisi River
The Inkisi hydroelectric sites in the DRC are at Bemba, Sanga2, Kimbungu, and Kilenfu on the Inkisi River in Kongo Central Province, in the west of the country. They have a combined potential of 185MW and are situated less than 150km from Kinshasa, which has a power deficit of about 1,000MW. The project aligns with…
View Project InfoInga 3 Development Program
The Inga 3 project is a strategic initiative by the DRC to build a hydroelectric dam with an estimated capacity of 4,800 MW on the Congo River in Central Kongo Province. It is the third phase of the Inga hydroelectric complex, which already includes the Inga I and Inga II power plants, and is part…
View Project InfoConstruction of Luapula Hydroelectric Power Plants
The Luapula hydroelectric site (Mambilima and Mumbotuta Falls) consists of waterfalls on the Luapula River on the border between Zambia and the DRC in the eastern part of Haut-Katanga Province. The potential is 800MW across three waterfalls. The site is in the most important mining area in the DRC, where the electricity deficit is around…
View Project Info