Construction of Hydroelectric Power Plants on the Inkisi River

Project Description

The Inkisi hydroelectric sites in the DRC are at Bemba, Sanga2, Kimbungu, and Kilenfu on the Inkisi River in Kongo Central Province, in the west of the country. They have a combined potential of 185MW and are situated less than 150km from Kinshasa, which has a power deficit of about 1,000MW.

The project aligns with public policies set out in:

  • The Government Action Program (2024–2028), which aims to develop electricity production capacity
  • The National Strategic Development Plan (PNSD 2024–28), which aims to guarantee reliable access to electricity for all social groups
  • The Master Plan for Industrialization of the DRC by 2040. This project is a high priority, serving as a key lever for industrialization and accelerating economic growth through access to clean, reliable, and competitive energy.

Project Location:

Item Site name Coordinates Capacity (MW) Production (GWh/year)
1 Zongo 3 4°47’54,75’’S/14°54’58,35’’E 36 210
2 Sanga 2 4°50’35,69’’S/14°57’20,88’’E 60 360
3 Kimbungu 4°53’33,42’’S/14°59’29,45’’E 40 240
4 Kilefu 4°57’43.98″S/15° 4’25.11″E 50 300

Lead Agency/ Project Promoter:

National Electricity Company SNEL SA

Contact

2831 Avenue de la Justice, Kinshasa/Gombe, Democratic Republic of Congo, PO Box 500
Tel: +243 816 706 254
Email: snel_dg@snel.cd

Actions Required/ Implementation Arrangements/ Contract Type:

Concession Type of Public Private Partnership: Special Purpose Vehicle (SPV)

Availability of Pre-feasibility Studies, Feasibility Studies, and other Studies:

Supporting documents available for partners:

  • SNEL SA’s Master Plan for the Development of Electrical Infrastructure
  • SNEL SA Priority Investment Program
  • SNEL SA Business Plan
  • SNEL SA Recovery Plan

Estimated Cost of the Project:

US 442,900,000 (Capex US 430,000,000; Opex US 12,000,000)

Investment Required

US 442,900,000

Project Financial Position:

Expected annual revenue: US106,400,000 a year (based on 1,110GWh/year of producible electrical energy, excluding various technical and non-technical losses)

Period of Implementation:

For each of the falls, the timetable is:

  • Studies: eight months;
  • Procurement and contracting: 6 months
  • Construction work: five years
  • Operation: 30 years

Remarks:

Specific objectives, particularly in quantitative terms:

  • Develop the hydroelectric potential of the Inkisi River
  • Significantly increase installed capacity in the DRC
  • Reduce power outages in Kinshasa
  • Promote private investment in clean energy.
Please register or login to download this investment project PDF.
REGISTER

Login

Country

DR Congo

Location (s)
Sector

Infrastructure: Transport, Energy, ICT, Mining and Water

Sub Sector

Renewable Energy

Investment Value Range

+ 100 million USD

View country profile(s) for investment incentives, success stories and other publications.

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

DR Congo Investment News

Kinshasa enters shipping business, set to rock EA boats

May 22, 2022

A vessel docks at the port of Dar es Salaam. The DR Congo says it has obtained yard spaces in Mombasa and Dar es Salaam to roll out offices for its new shipping line, The Lignes Maritimes Congolaises, that will start operations from June. PHOTO | AFP The Democratic Republic of Congo is entering shipping…

READ NEWS

DRC State-owned shipping line to set base in Mombasa

May 16, 2022

A shipping line from the Democratic Republic of Congo plans to start its operations from Mombasa beginning June this year. The state-owned shipping line, the Lignes Maritimes Congolaises (LMC) seeks to channel more DRC imports and exports cargo through the Port of Mombasa. A delegation from DRC led by the shipping line director LMC Dr…

READ NEWS

52 ZAMBIAN BUSINESSES IN DRC FOR TRADE:

October 20, 2021

The first cohort of over 52 representatives of Zambian companies has arrived in the Democratic Republic of Congo (DRC) ready to talk business with their Congolese business counterparts. The delegation is led by Zambia Development Agency (ZDA ) Acting Director General Albert Halwampa, ZDA Director Enterprise Development Gabriel Musentekwa, ZDA Acting Director Export Development Obby Banda,…

READ NEWS

DRC: Clean-Seas to Generate Electricity From Plastic Waste via Pyrolysis

August 5, 2021

Clean-Seas, a provider of waste management technology solutions, have been selected to build a waste-to-energy plastics plant using pyrolysis technology in Kinshasa, the capital of the Democratic Republic of Congo (DRC). The project aims to produce 96 MWh of electricity per year. The plastic waste-to-energy project in Kinshasa can begin. On August 3rd, 2021, Hamden,…

READ NEWS

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

More Renewable Energy Investment Projects in DR Congo

Construction of the “Porte d’Enfer” Hydroelectric Power Plant

The Porte d’Enfer hydroelectric site is located on the Congo River in Tanganyika Province in southeastern DRC with potential of 132MW. The existing Bendera hydroelectric power plant only provides 18MW, which does not meet the needs of surrounding urban areas. The Porte d’Enfer power plant is urgently needed to strengthen the southern electricity production hub…

View Project Info

Inga 3 Development Program

The Inga 3 project is a strategic initiative by the DRC to build a hydroelectric dam with an estimated capacity of 4,800 MW on the Congo River in Central Kongo Province. It is the third phase of the Inga hydroelectric complex, which already includes the Inga I and Inga II power plants, and is part…

View Project Info

Construction of Luapula Hydroelectric Power Plants

The Luapula hydroelectric site (Mambilima and Mumbotuta Falls) consists of waterfalls on the Luapula River on the border between Zambia and the DRC in the eastern part of Haut-Katanga Province. The potential is 800MW across three waterfalls. The site is in the most important mining area in the DRC, where the electricity deficit is around…

View Project Info