Construction of 287MW Ruzizi IV Hydropower Project

Project Description

The power plant will be set on the Ruzizi River, straddling the common border between Rwanda and the Democratic Republic of the Congo. It is about 5km, as the crow flies, west of the town of Bugarama, Rusizi District, in Rwanda’s Western Province.

Ruzizi IV is near three other hydroelectric power stations along River Ruzizi, namely Ruzizi I, II and III.

This power plant will be the fourth in a cascade of power plants on the Ruzizi River with installed capacity of 287MW, benefiting Burundi, DRC and Rwanda. The power generated will be equally shared between three countries.

Objective and rationale for the project:

It is a regional project that will serve three countries – Rwanda, Burundi and DRC. The project will provide electricity to millions of households, as well as industry from small and medium-sized enterprises and to large companies, thereby improving the living conditions of the regional population. Improved and more reliable access to electricity will improve the quality of basic social service delivery and enhance security.

PROJECT LOCATION

The power station is located on the Ruzizi River, straddling the common border between Rwanda and the DRC

CURRENT STATUS / STATE OF THE PROJECT

Pre-feasibility stage

ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS /  CONTRACT TYPE

Feasibility

AVAILABILITY OF PREFEASIBILITY STUDIES, FEASIBILITY STUDIES, AND OTHER STUDIES

Pre-feasibility study is available

ESTIMATED COST OF THE PROJECT

USD 712 million

Please register or login to download this investment project PDF.
REGISTER

Login

Country

DR Congo, Rwanda

Location (s)

Bugarama/ Ruzizi River

Sector

Infrastructure: Transport, Energy, ICT, Mining and Water

Sub Sector

Renewable Energy

Investment Value Range

+ 100 million USD

View country profile(s) for investment incentives, success stories and other publications.

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
Hidden
This field is for validation purposes and should be left unchanged.

DR Congo, Rwanda Investment News

Kinshasa enters shipping business, set to rock EA boats

May 22, 2022

A vessel docks at the port of Dar es Salaam. The DR Congo says it has obtained yard spaces in Mombasa and Dar es Salaam to roll out offices for its new shipping line, The Lignes Maritimes Congolaises, that will start operations from June. PHOTO | AFP The Democratic Republic of Congo is entering shipping…

READ NEWS

Rwandan startup listed among World Economic Forum’s Technology Pioneers of 2022

May 17, 2022

The World Economic Forum (WEF) has unveiled a list of 100 innovative tech startups for its 2022 Technology Pioneers cohort which include a Rwandan firm, Ampersand. According to WEF, the Technology Pioneers’ list is an assemblage of leading “early-to growth-stage companies from around the world that are pioneering new technologies and innovations.” These startups are…

READ NEWS

DRC State-owned shipping line to set base in Mombasa

May 16, 2022

A shipping line from the Democratic Republic of Congo plans to start its operations from Mombasa beginning June this year. The state-owned shipping line, the Lignes Maritimes Congolaises (LMC) seeks to channel more DRC imports and exports cargo through the Port of Mombasa. A delegation from DRC led by the shipping line director LMC Dr…

READ NEWS

Rwanda and Alibaba launch the first Electronic World Trade Platform hub in Africa

May 10, 2022

The government of Rwanda and Alibaba have come together to establish the first Electronic World trade Platform hub in Africa. The agreement will strengthen economic development and digital economy of Rwanda. It also ensures trading of Rwandan products and will facilitate tourism in Rwanda. The trading of products in China will ensure the improvement in…

READ NEWS

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
Hidden
This field is for validation purposes and should be left unchanged.

More Renewable Energy Investment Projects in DR Congo, Rwanda

Gates of Hell Hydroelectric Plant

PROJECT DESCRIPTION: The project entails the following: Studies for the hydro plant building and electricity transport lines Civil engineering constructions of river plant and buildings Hydro-mechanic and electrical equipment installation Transport lines from the Gates of Hell-Kongolo (12km) and Gates of Hell-Kabalo (75km) Post construction HT/MT at Kongolo and Kabalo Energy supply network MT/BT at…

View Project Info

Baraka Hydroelectric Plant

PROJECT DESCRIPTION: The project entails the following: Building 4.1 MW hydroelectric plant at Mutambala River Studies for the hydro plant building and electricty transport lines Civil engineering construction of river plant and buildings Hydro-mechanic and electrical equipment installation Transport lines of 52km (3O KV lines) Post construction HT/MT at Kongolo and Kabalo Energy supply network…

View Project Info

Construction and Operation of a 1,100 Kwh hydroelectric plant to electrify the city of Bena Leka and its surroundings

PROJECT DESCRIPTION: The project entails the construction and operationalization of a 700 kW hydroelectric plant on the Mwanza-Ngoma River. Demand is estimated at 20 MW For Demba with 16,500 households. PROJECT LOCATION: Tshopo LEAD AGENCY/ PROJECT PROMOTER: ANSER, Government, Province of Tshopo, and ANAPI ESTIMATED COST OF THE PROJECT: USD2,250,000 PERIOD OF IMPLEMENTATION: 1 year

View Project Info

Construction and Operation of 700 kW Hydroelectric Plant – Rubi River

PROJECT DESCRIPTION: The project entails the construction and operationalization of a 700 kW hydroelectric plant on the Rubi River to electrify the city of Aketi and its surrounds. Overall demand is estimated at 9 MW for 10,500 households. PROJECT LOCATION: Bas-Uélé LEAD AGENCY/ PROJECT PROMOTER: ANSER, Government, Province of Bas-Uele, and ANAPI ESTIMATED COST OF…

View Project Info

Bobindi Hydroelectric Plant

PROJECT DESCRIPTION: Expected capacity: 300 MW 212 MW served to 544,963 households 72 MW for business 9 MW for public lighting PROJECT LOCATION: South-Ubangi ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS/ CONTRACT TYPE: Investors (100%) ESTIMATED COST OF THE PROJECT: USD 1,213,385,855 (USD 1.2 billion) PERIOD OF IMPLEMENTATION: 25 years

View Project Info