Project Description
The project entails the construction of a 175m high roller compact gravity arch dam and two 1,200MW capacity hydro power generation plants and associated transmission infrastructure on both sides (Batoka North and South)
The objective of the project is to improve access to electricity services to the two contracting states and the region by the construction of the Batoka Hydroelectric Scheme Project
PROJECT LOCATION
Zambia and Zimbabwe
CURRENT STATUS / STATE OF THE PROJECT
Financing Stage
ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS / CONTRACT TYPE
Public Private Partnership
AVAILABILITY OF PREFEASIBILITY STUDIES, FEASIBILITY STUDIES, AND OTHER STUDIES
Feasibility study is available
ESTIMATED COST OF THE PROJECT
USD 5 billion
PERIOD OF IMPLEMENTATION
Four years
Please register or login to download this investment project PDF.
REGISTER
Login
Country
Zambia, Zimbabwe
Location (s)
Batoka Gorge
Sector
Infrastructure: Transport, Energy, ICT, Mining and Water
Sub Sector
Renewable Energy
Investment Value Range
+ 100 million USD
View country profile(s) for investment incentives, success stories and other publications.
Get in Touch
Interested in this project? Please get in touch by filling out the contact form below.
ComesaRIA Investment Map Get In Touch
Investment project information request
"*" indicates required fields
Zambia, Zimbabwe Investment News
Zambia, Angola strengthens bilateral ties
Zambia and Angola have signed an addendum to operationalise the Bilateral Trade Agreement that was signed in 2016. The Agreement will see an enhancement of trade and economic relations between the two countries and ensure some products are traded duty free. Speaking during a bilateral ministerial meeting held at the Ministry of Industry and Commerce…
READ NEWSZambia will start exporting an additional 80 MW of electricity to Namibia
Zambia will start exporting an additional 80 MW of electricity to Namibia following an agreement signed by the utility companies of the two countries on Tuesday in Lusaka Zambia’s Zesco Limited and Namibia’s Nampower signed a power supply agreement for the export of an additional 80 MW in addition to 100 MW being exported after…
READ NEWS52 ZAMBIAN BUSINESSES IN DRC FOR TRADE:
The first cohort of over 52 representatives of Zambian companies has arrived in the Democratic Republic of Congo (DRC) ready to talk business with their Congolese business counterparts. The delegation is led by Zambia Development Agency (ZDA ) Acting Director General Albert Halwampa, ZDA Director Enterprise Development Gabriel Musentekwa, ZDA Acting Director Export Development Obby Banda,…
READ NEWS- « Previous
- 1
- 2
Get in Touch
Interested in this project? Please get in touch by filling out the contact form below.
ComesaRIA Investment Map Get In Touch
Investment project information request
"*" indicates required fields
More Renewable Energy Investment Projects in Zambia, Zimbabwe
Mkwasine Dam
PROJECT DESCRIPTION: The project entails the construction of a dam with a capacity of 105 million cubic metres, development of an irrigation scheme and construction of a mini-hydro power generation plant. PROJECT LOCATION: Masvingo Province LEAD AGENCY/ PROJECT PROMOTER: Zimbabwe National Water Authority (ZINWA) ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS/ CONTRACT TYPE: – Public Private Partnership (PPP)…
View Project InfoAmapongokwe Dam
PROJECT DESCRIPTION: The proposed dam is on the Mapongokwe River. The centre line of the wall will be about 500m downstream from the Makati and Mapongokwe river confluence. It is shown on a locality sketch drawing 11481-SK. It can be located at Grid Reference QJ978091, of the 1:50000 map series. The dam has provisions for…
View Project InfoMutinondo and Luchenene Hydropower Project
PROJECT DESCRIPTION: The Mutinondo Luchenene Power Company (MLPC) is a company that was formed to develop, construct, own and operate the Mutinondo and Luchenene hydroelectric facilities. It is anticipated that the project will generate up to 591 GWh of electrical energy per year and injecting this into the national grid with the power being taken…
View Project InfoDevelopment of Chipota Falls 200 KW Mini-Hydro Power
PROJECT DESCRIPTION: This is a poverty alleviation and assistance project aimed at providing electricity access to over 15,000 people in a rural community that will catalyze social and economic activities in the area and increase the capacity of key stakeholders in mini-hydro project implementation through stage-by-stage and on-site capacity building in implementing hydro power projects.…
View Project InfoLufubu Hydropower Plant
PROJECT DESCRIPTION: Construction of a cascade of three power plants along the Lufubu River with an installed capacity of 163 MW PROJECT LOCATION: Mpulungu and Nsama Districts, Northern Province, Zambia LEAD AGENCY/PROJECT PROMOTER: Lufubu Power Company Limited CURRENT STATUS/ STAGE OF PROJECT: Greenfield ACTION REQUIRED/ IMPLEMENTATION: Partners IMPLEMENTATION ARRANGEMENTS/ CONTRACT TYPE: FDI through Minority stake…
View Project InfoGigawatt Global 71 MW Hybrid Wind/Solar Project
PROJECT DESCRIPTION: This project involves the establishment of a 71 MW solar-wind hybrid plant project. PROJECT LOCATION: Chibombo District, Central Province, Zambia LEAD AGENCY/PROJECT PROMOTER: Gigawatt Renewables Zambia Limited CURRENT STATUS/ STAGE OF PROJECT: Greenfield ACTION REQUIRED/ IMPLEMENTATION: Partners IMPLEMENTATION ARRANGEMENTS/ CONTRACT TYPE: Open for FDI through a majority stake ESTIMATED COST OF THE PROJECT:…
View Project InfoCharcoal Briquettes Making
PROJECT DESCRIPTION: This project involves the building of a plant to make charcoal briquettes from biomass as an alternative to hydropower, costly solar power and unsustainable charcoal burning practices. Technical Details: Annual output of 253 tons Critical components include a crusher, air flow dryer, briquette making machine and a carbonization furnace PROJECT LOCATION: Copperbelt Province,…
View Project InfoRunde River Dam
PROJECT DESCRIPTION: The project entails the construction of a rock-fill dam on the Runde River in Masvingo Province under the Runde Catchment. The dam is about 90m high. It will have a total volume of rock fill of about 2,000,000m³ and a central core volume of about 520,000m³. The water storage capacity will be about…
View Project InfoNgonye Falls Hydroelectric Project
PROJECT DESCRIPTION: Ngonye Falls Hydroelectric Project is a project of Western Power Company. It will be the largest run-of-river hydro in Zambia and largest Zambian renewable private power producer (IPP) with 180 MW capacity and 830 GWh per year of energy generation. PROJECT LOCATION: Zambezi River, Western Province LEAD AGENCY/PROJECT PROMOTER: Western Power Company Limited…
View Project Info12MW Kapamba Mini-Hydro Power Project
PROJECT DESCRIPTION: This project will involve the supply, delivery, installation, testing and commissioning of three units (3×4000kW) of the Kapamba Mini Hydropower Project, including construction of the powerhouse, canal, dam, forebay and switchyard and supplying mechanical and electrical equipment for power generation. PROJECT LOCATION: Mpika District, Muchinga Province LEAD AGENCY/PROJECT PROMOTER: Atlantic Commodities Limited (ACL)…
View Project InfoNyatana Dam/Power Generation project
PROJECT DESCRIPTION: The project entails the construction of a zoned earth-fill dam cross the Mazowe River in Mudzi District of Mashonaland East Province. Project beneficiaries are the communities and farmers in Mudzi and Mutoko Districts. PROJECT LOCATION: Mudzi District, Mashonaland East LEAD AGENCY/ PROJECT PROMOTER: Zimbabwe National Water Authority (ZINWA) ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS/ CONTRACT…
View Project InfoDevelopment of the 118.4MW Hydro-Electricity Plant and Associated Facilities in Zambia
PROJECT DESCRIPTION: This project involves the development of the 118.4 MW MLHEP Station which is designed to exploit the energy potential of the Mulembo River in Mkushi and Luano Districts and Lelya River on the border of Nyimba and Serenje districts. Technical Details: Gross head of the two rivers is about 450m Anticipated to generate…
View Project InfoMirror Dam Project
PROJECT DESCRIPTION: Dam construction for agriculture and commercial industrial use PROJECT LOCATION: Chipinge LEAD AGENCY/ PROJECT PROMOTER: Zimbabwe National Water Authority (ZINWA) CURRENT STAGE OF THE PROJECT: Implementation stage ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS/ CONTRACT TYPE: Public Private Partnership (PPP) AVAILABILITY OF PRE-FEASIBILITY STUDIES, FEASIBILITY STUDIES, AND OTHER STUDIES: Feasibility study available ESTIMATED COST OF THE…
View Project Info