Construction and Operation of a 1,100 Kwh hydroelectric plant to electrify the city of Bena Leka and its surroundings

Project Description

PROJECT DESCRIPTION:

The project entails the construction and operationalization of a 700 kW hydroelectric plant on the Mwanza-Ngoma River. Demand is estimated at 20 MW For Demba with 16,500 households.

PROJECT LOCATION:

Tshopo

LEAD AGENCY/ PROJECT PROMOTER:

ANSER, Government, Province of Tshopo, and ANAPI

ESTIMATED COST OF THE PROJECT:

USD2,250,000

PERIOD OF IMPLEMENTATION:

1 year

Please register or login to download this investment project PDF.
REGISTER

Login

Country

DR Congo

Location (s)

Tshopo

Sector

Infrastructure: Transport, Energy, ICT, Mining and Water

Sub Sector

Renewable Energy

Investment Value Range

1-5 million USD

View country profile(s) for investment incentives, success stories and other publications.

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
Hidden
This field is for validation purposes and should be left unchanged.

DR Congo Investment News

Kinshasa enters shipping business, set to rock EA boats

May 22, 2022

A vessel docks at the port of Dar es Salaam. The DR Congo says it has obtained yard spaces in Mombasa and Dar es Salaam to roll out offices for its new shipping line, The Lignes Maritimes Congolaises, that will start operations from June. PHOTO | AFP The Democratic Republic of Congo is entering shipping…

READ NEWS

DRC State-owned shipping line to set base in Mombasa

May 16, 2022

A shipping line from the Democratic Republic of Congo plans to start its operations from Mombasa beginning June this year. The state-owned shipping line, the Lignes Maritimes Congolaises (LMC) seeks to channel more DRC imports and exports cargo through the Port of Mombasa. A delegation from DRC led by the shipping line director LMC Dr…

READ NEWS

52 ZAMBIAN BUSINESSES IN DRC FOR TRADE:

October 20, 2021

The first cohort of over 52 representatives of Zambian companies has arrived in the Democratic Republic of Congo (DRC) ready to talk business with their Congolese business counterparts. The delegation is led by Zambia Development Agency (ZDA ) Acting Director General Albert Halwampa, ZDA Director Enterprise Development Gabriel Musentekwa, ZDA Acting Director Export Development Obby Banda,…

READ NEWS

DRC: Clean-Seas to Generate Electricity From Plastic Waste via Pyrolysis

August 5, 2021

Clean-Seas, a provider of waste management technology solutions, have been selected to build a waste-to-energy plastics plant using pyrolysis technology in Kinshasa, the capital of the Democratic Republic of Congo (DRC). The project aims to produce 96 MWh of electricity per year. The plastic waste-to-energy project in Kinshasa can begin. On August 3rd, 2021, Hamden,…

READ NEWS

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
Hidden
This field is for validation purposes and should be left unchanged.

More Renewable Energy Investment Projects in DR Congo

Baraka Hydroelectric Plant

PROJECT DESCRIPTION: The project entails the following: Building 4.1 MW hydroelectric plant at Mutambala River Studies for the hydro plant building and electricty transport lines Civil engineering construction of river plant and buildings Hydro-mechanic and electrical equipment installation Transport lines of 52km (3O KV lines) Post construction HT/MT at Kongolo and Kabalo Energy supply network…

View Project Info

Bobindi Hydroelectric Plant

PROJECT DESCRIPTION: Expected capacity: 300 MW 212 MW served to 544,963 households 72 MW for business 9 MW for public lighting PROJECT LOCATION: South-Ubangi ACTIONS REQUIRED/ IMPLEMENTATION ARRANGEMENTS/ CONTRACT TYPE: Investors (100%) ESTIMATED COST OF THE PROJECT: USD 1,213,385,855 (USD 1.2 billion) PERIOD OF IMPLEMENTATION: 25 years

View Project Info

Construction and Operation of 700 kW Hydroelectric Plant – Rubi River

PROJECT DESCRIPTION: The project entails the construction and operationalization of a 700 kW hydroelectric plant on the Rubi River to electrify the city of Aketi and its surrounds. Overall demand is estimated at 9 MW for 10,500 households. PROJECT LOCATION: Bas-Uélé LEAD AGENCY/ PROJECT PROMOTER: ANSER, Government, Province of Bas-Uele, and ANAPI ESTIMATED COST OF…

View Project Info

Gates of Hell Hydroelectric Plant

PROJECT DESCRIPTION: The project entails the following: Studies for the hydro plant building and electricity transport lines Civil engineering constructions of river plant and buildings Hydro-mechanic and electrical equipment installation Transport lines from the Gates of Hell-Kongolo (12km) and Gates of Hell-Kabalo (75km) Post construction HT/MT at Kongolo and Kabalo Energy supply network MT/BT at…

View Project Info