{"id":4463,"date":"2026-09-15T13:25:00","date_gmt":"2026-09-15T13:25:00","guid":{"rendered":"https:\/\/comesaria.org\/investmentmap\/?post_type=investment_project&#038;p=4463"},"modified":"2026-09-15T15:59:38","modified_gmt":"2026-09-15T15:59:38","slug":"batoka-gorge-hydro-electric-scheme","status":"publish","type":"investment_project","link":"https:\/\/comesaria.org\/investmentmap\/investment_project\/batoka-gorge-hydro-electric-scheme\/","title":{"rendered":"Batoka Gorge Hydro-Electric Scheme"},"content":{"rendered":"<p>A bi-national hydropower project between Zimbabwe and Zambia to generate 2,400MW through construction of a dam, two power stations, and associated infrastructure.<\/p>\n<h4>Project Location:<\/h4>\n<p>Zambezi River (47km downstream from Victoria Falls)<\/p>\n<h4>Lead Agency\/ Project Promoter:<\/h4>\n<p>Zambezi River Authority (ZRA)<\/p>\n<h4>Contact<\/h4>\n<p>Email: <a href=\"mailto:schizwina@zidainvest.com\">schizwina@zidainvest.com<\/a> \/ <a href=\"mailto:nmahombera@zidainvest.com\">nmahombera@zidainvest.com<\/a><\/p>\n<h4>Current Status\/ Stage of Project:<\/h4>\n<p>Project preparation stage (updating feasibility, ESIA, and advisory documents)<\/p>\n<h4>Actions Required\/ Implementation Arrangements\/ Contract Type:<\/h4>\n<p>Public Private Partnership structure (30% equity, 70% debt); seeking investors and technical partners<\/p>\n<h4>Availability of Pre-feasibility Studies, Feasibility Studies, and other Studies:<\/h4>\n<p>Engineering Feasibility Study, ESIA, Financial &#038; Commercial Advisory (being updated)<\/p>\n<h4>Estimated Cost of the Project:<\/h4>\n<p>USD 4,25 billion<\/p>\n<h4>Investment Required<\/h4>\n<p>USD 4,25 billion<\/p>\n<h4>Project Financial Position:<\/h4>\n<p>Strong viability (NPV: USD3.02bn, ROI: 9.41%, Payback: 4.5 years)<\/p>\n<h4>Period of Implementation:<\/h4>\n<p>Not specified (long-term infrastructure project)<\/p>\n<h4>Remarks:<\/h4>\n<p>Flagship regional renewable energy project with strong SAPP impact<\/p>\n","protected":false},"featured_media":2239,"template":"","country":[136],"sector":[142],"subsector":[323],"place":[441,541],"investment_range":[213],"class_list":["post-4463","investment_project","type-investment_project","status-publish","has-post-thumbnail","hentry","country-zimbabwe","sector-infrastructure-transport-energy-ict-mining-and-water","subsector-renewable-energy","place-batoka-gorge","place-zambezi-river","investment_range-100-million-usd"],"_links":{"self":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/investment_project\/4463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/investment_project"}],"about":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/types\/investment_project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/media\/2239"}],"wp:attachment":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/media?parent=4463"}],"wp:term":[{"taxonomy":"country","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/country?post=4463"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/sector?post=4463"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/subsector?post=4463"},{"taxonomy":"place","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/place?post=4463"},{"taxonomy":"investment_range","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/investment_range?post=4463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}