{"id":4334,"date":"2026-09-09T23:07:00","date_gmt":"2026-09-09T23:07:00","guid":{"rendered":"https:\/\/comesaria.org\/investmentmap\/?post_type=investment_project&#038;p=4334"},"modified":"2026-09-10T10:22:47","modified_gmt":"2026-09-10T10:22:47","slug":"inga-3-development-program","status":"publish","type":"investment_project","link":"https:\/\/comesaria.org\/investmentmap\/investment_project\/inga-3-development-program\/","title":{"rendered":"Inga 3 Development Program"},"content":{"rendered":"<p>The Inga 3 project is a strategic initiative by the DRC to build a hydroelectric dam with an estimated capacity of 4,800 MW on the Congo River in Central Kongo Province. It is the third phase of the Inga hydroelectric complex, which already includes the Inga I and Inga II power plants, and is part of the Grand Inga program, which aims to exploit the river&#8217;s energy potential of more than 40,000 MW.<\/p>\n<p>This project aims to provide sustainable electricity to support national industrial growth and exports to neighboring countries in outhern African region.<\/p>\n<p>Public policies:<\/p>\n<ul>\n<li>The Government Action Program (2024\u20132028)<\/li>\n<li>The National Strategic Development Plan (PNSD 2024\u201328)<\/li>\n<li>The DRC Industrialization Master Plan for 2040.<\/li>\n<\/ul>\n<h4>Project Location:<\/h4>\n<p>Central Kongo Province<\/p>\n<h4>Lead Agency\/ Project Promoter:<\/h4>\n<p>Agency for the Development and Promotion of the Grand Inga Project (ADPI)<\/p>\n<h4>Contact<\/h4>\n<p>26 ITPR Building, 1st floor, Boulevard Colonel Tshatshi, Kinshasa\/Gombe<br \/>\nTel: <a href=\"tel:+243812345678\">+243 812 345 678<\/a> \/ <a href=\"tel:811971504\">811 971 504<\/a><br \/>\nEmail: <a href=\"mailto:info@adpi-rdc.com\">info@adpi-rdc.com<\/a><br \/>\nWebsite: <a href=\"https:\/\/adpi-rdc.com\/\" target=\"_blank\" rel=\"noopener\">https:\/\/adpi-rdc.com\/<\/a><\/p>\n<h4>Actions Required\/ Implementation Arrangements\/ Contract Type:<\/h4>\n<ul>\n<li>Joint venture,<\/li>\n<li>Public Private Partnership<\/li>\n<li>Loan<\/li>\n<\/ul>\n<h4>Availability of Pre-feasibility Studies, Feasibility Studies, and other Studies:<\/h4>\n<ul>\n<li>PDI3 brochures<\/li>\n<li>Site visualization maps<\/li>\n<li>Technical reports<\/li>\n<\/ul>\n<h4>Estimated Cost of the Project:<\/h4>\n<p>US 1,000,000,000<\/p>\n<h4>Investment Required<\/h4>\n<p>US 1,000,000,000<\/p>\n<h4>Period of Implementation:<\/h4>\n<ul>\n<li>Phase 1 (2025-2030): Project preparation;<\/li>\n<li>Phase 2 (2027-2035): Inga3 development phase and national and regional investments<\/li>\n<li>Phase 3 (2028-2034): Local development within the Iinga3 footprint<\/li>\n<li>Phase 4 (2028-2035): Development of the Inga Growth Corridor<\/li>\n<\/ul>\n<h4>Remarks:<\/h4>\n<p>A prerequisite for national economic growth, promoting development of the industrial sector, especially mining, whose competitiveness and productivity are heavily dependent on electricity.<\/p>\n","protected":false},"featured_media":2222,"template":"","country":[228],"sector":[142],"subsector":[323],"place":[746],"investment_range":[213],"class_list":["post-4334","investment_project","type-investment_project","status-publish","has-post-thumbnail","hentry","country-dr-congo","sector-infrastructure-transport-energy-ict-mining-and-water","subsector-renewable-energy","place-kongo-central","investment_range-100-million-usd"],"_links":{"self":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/investment_project\/4334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/investment_project"}],"about":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/types\/investment_project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/media\/2222"}],"wp:attachment":[{"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/media?parent=4334"}],"wp:term":[{"taxonomy":"country","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/country?post=4334"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/sector?post=4334"},{"taxonomy":"subsector","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/subsector?post=4334"},{"taxonomy":"place","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/place?post=4334"},{"taxonomy":"investment_range","embeddable":true,"href":"https:\/\/comesaria.org\/investmentmap\/wp-json\/wp\/v2\/investment_range?post=4334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}