Construction of the Kinshasa City Center Highway

Project Description

Construction of a 28km highway in downtown Kinshasa as a fast, direct route to Ndjili Airport.

Project objectives:

  • Significantly reduce travel time between the city center and the airport
  • Relieve congestion on Kinshasa’s main urban arteries
  • Facilitate the transport of people and goods between key economic areas
  • Enhance the economic and tourist appeal of the capital

Project Location:

Kinshasa

Lead Agency/ Project Promoter:

Congolese Agency for Major Works (ACGT)

Contact

Likasi Building, Boulevard du 30 Juin, Place Royal, Gombe/Kinshasa
Tel: +243 811 938 848 / 815 00 61 15
Email: contact@acgt.cd
Website: www.acgt.cd

Actions Required/ Implementation Arrangements/ Contract Type:

Public Private Partnership

Availability of Pre-feasibility Studies, Feasibility Studies, and other Studies:

  • National Strategic Development Plan (PNSD 2024-2028)
  • Kinshasa Urban Transport Master Plan (PDTK)
  • ACGT Strategic Development Plan.

Estimated Cost of the Project:

USD 1,180,000,000

Remarks:

This will contribute to modernization of Kinshasa’s road network and the revitalization of its urban economy.

Please register or login to download this investment project PDF.
REGISTER

Login

Country

DR Congo

Location (s)

Kinshasa

Sector

Infrastructure: Transport, Energy, ICT, Mining and Water

Sub Sector

Road Transport

Investment Value Range

+ 100 million USD

View country profile(s) for investment incentives, success stories and other publications.

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

DR Congo Investment News

Kinshasa enters shipping business, set to rock EA boats

May 22, 2022

A vessel docks at the port of Dar es Salaam. The DR Congo says it has obtained yard spaces in Mombasa and Dar es Salaam to roll out offices for its new shipping line, The Lignes Maritimes Congolaises, that will start operations from June. PHOTO | AFP The Democratic Republic of Congo is entering shipping…

READ NEWS

DRC State-owned shipping line to set base in Mombasa

May 16, 2022

A shipping line from the Democratic Republic of Congo plans to start its operations from Mombasa beginning June this year. The state-owned shipping line, the Lignes Maritimes Congolaises (LMC) seeks to channel more DRC imports and exports cargo through the Port of Mombasa. A delegation from DRC led by the shipping line director LMC Dr…

READ NEWS

52 ZAMBIAN BUSINESSES IN DRC FOR TRADE:

October 20, 2021

The first cohort of over 52 representatives of Zambian companies has arrived in the Democratic Republic of Congo (DRC) ready to talk business with their Congolese business counterparts. The delegation is led by Zambia Development Agency (ZDA ) Acting Director General Albert Halwampa, ZDA Director Enterprise Development Gabriel Musentekwa, ZDA Acting Director Export Development Obby Banda,…

READ NEWS

DRC: Clean-Seas to Generate Electricity From Plastic Waste via Pyrolysis

August 5, 2021

Clean-Seas, a provider of waste management technology solutions, have been selected to build a waste-to-energy plastics plant using pyrolysis technology in Kinshasa, the capital of the Democratic Republic of Congo (DRC). The project aims to produce 96 MWh of electricity per year. The plastic waste-to-energy project in Kinshasa can begin. On August 3rd, 2021, Hamden,…

READ NEWS

Get in Touch

Interested in this project? Please get in touch by filling out the contact form below.

ComesaRIA Investment Map Get In Touch

Investment project information request

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

More Road Transport Investment Projects in DR Congo

Construction and Operation of Toll and Weighing Systems on the RN1 Kikwit-Tshikapa axis (Kibunungu and Kasala)

Construct and operate modern toll booths and weighing stations on National Road No. 1 on the road between Kikwit and Tshikapa (Kasala). Overall project objective: Ensure the sustainability, safety, and efficiency of the national road network between Kikwit and Tshikapa. Project Location: Kinshasa–Kikwit Lead Agency/ Project Promoter: National Road Maintenance Fund (FONER) Contact 10 Avenue…

View Project Info